Наверх

News

Transneft Volga Region completed scheduled repairs at oil trunk pipelines Transneft Volga Region completed scheduled repairs at oil trunk pipelines

АО «Транснефть – Приволга» завершило плановые ремонтные работы на магистральных нефтепроводах (МН) Куйбышев – Тихорецк, Жирновск – Волгоград, Саратов – Кузьмичи, Альметьевск – Куйбышев-2. В ремонтных мероприятиях были задействованы 720 человек и 353 единицы спецтехники и оборудования.

Transneft Volga Region, JSC organized a drill at Pokrovskaya OPS and the underwater crossing of Buguruslan – Syzran OTP over the Samara river

Transneft Volga Region organized a complex emergency response drill (CERD) at  Pokrovskaya oil pump station (OPS) of Samara Regional Oil Pipeline Directorates (RPD) and the underwater crossing of Buguruslan – Syzran oil trunk pipeline (OTP) over the  Samara river, during which the specialists had to eliminate an imaginary emergency with seepage of oil into the river and a number of failures of the equipment at OPS.